Works on the revetment have been progressing well despite high tides preventing works on the lower revetment at times.
![]() |
![]() |
Removal of old revetment material. |
Providing a new foundation and level guides for the new revetment surface. |
![]() |
![]() |
Completed lower section of revetment including drainage. |
Further up the walkway the small retaining wall between the walkway and the canal has been dismantled. This is now scheduled for reconstruction with a new concrete foundation to ensure its future stability. |