Cormac have been continuing to work on the sand tram way sloping revetment by dismantling the old structure and re-building the revetment with a concrete foundation. They are also providing drainage to the structure - something that the original revetment lacked.
The old revetment blockwork has been removed and sorted, with the intention to re-use as much of the original blockwork as possible.
After weeks of good weather, the recent change in weather has proved challenging. Recent high tides have also prevented work on the lower section of the revetment at times. However, works have proceeded elsewhere on site.
The next week's work will focus on the rebuilding of the short wall next to the siding higher up the revetment, whilst waiting for the delivery of the tramway replacement rails.
![]() |
![]() |
![]() |