Truro, Chellew Rd: Puffin Pedestrian Crossing
A new puffin pedestrian crossing is proposed for Chellew Road in Truro.
The survey is now open for responses until 27/08/2026.
What are we consulting on?
We are inviting comments on a proposal to introduce a new controlled pedestrian crossing facility within the existing signalised junction at the junction between Tregolls Road, Trevithick Road & Chellew Road/Beachwood Park, by upgrading the existing uncontrolled crossing facility to a controlled crossing arrangement.
It is therefore proposed to convert the existing uncontrolled crossing on Tregolls Road into a pedestrian crossing, operated via a push-button control, enabling pedestrians to cross the carriageway more safely and conveniently.
The proposal also includes the removal of the existing right-turn lane and its conversion to a grass verge, together with the conversion of the existing middle lane into a straight ahead and right-turn lane. These changes will enable the existing refuge island to be widened, simplify the current crossing arrangement, and improve the overall operation and safety of the junction for all road users.
For further details of the proposed location and layout, please refer to the site notice.
Why are we doing this?
It is considered that the introduction of these measures will increase the safety of pedestrians when crossing the road, where the current arrangement makes safe and convenient crossing difficult, particularly during peak periods.
How can I respond to this consultation?
To provide us with feedback about these proposals, please complete the Feedback Form below.
Alternatively, you can email Cormac Infrastructure Design at traffic@cormacltd.co.uk or post a response to Infrastructure Design Group, Cormac Consultancy, Radnor Road, Scorrier, Redruth, TR16 5EH. When emailing or responding by post, please quote the following scheme reference Infra24-170.
All responses received will be given due consideration. Following the closure of the consultation period and subsequent scheme assessment process, we will provide you with an update on both the result of this process and, if applicable, the anticipated timescales for any associated works.
We regret that if you choose not to provide your address or withdraw your personal information before the completion of the scheme assessment process, we will be unable to consider your response in regard to a particular aspect of the scheme. Nonetheless, any points made will still be considered as general comments. If neither a postal address or email address is provided, we will also be unable to keep you updated on the scheme's progress.